U1481

返回

详细参数说明

Length
Width
Thickness
Weight
3200mm
1600mm
20mm
245kg
3200mm
1600mm
30mm
368kg
SPECIFICATION AND QUALITY STANDARDS
Inspection items
Quality inspection standards
Inspection standards
Inspection method
Length
Length error
±3mm
Steel tape measurement
Width
Width error
±3mm
Steel tape measurement
Thickness
Thickness error
±0.5mm
Steel tape measurement
Diagonal
Diagonal error
≤5mm
Vernier caliper measurement
Evenness
Flatness error
±0.2mm
Steel tape measurement
Edge unevenness
Deviation of non straightness at the edge of the board
±0.1mm
Steel tape measurement
APPEARANCE QUALITY STANDARDS
Inspection items
Quality inspection standards
Inspection items
Sand holes Bubble Pockmarks
Not allow
Visual inspection+steel tape measurement
Scratch
No obvious scratches allowed
visualization
Flaw
not allow
visualization
Chromatism
Color difference is not allowed for the same batch of slabs
Direct visual inspection under 600mm natural light
Miscellaneous cluster Chromophore
The impurity particles on the front side of particle slabs do not exceed the maximum particles in the slabs ≤1/m². Impurities over the largest particles are not allowed or impurities more obvious are not allowed
Visual inspection+steel tape measurement
Paste repair
Front side allows a small range of repair (such as less than 1mm of impurities or air holes), after repairing the slab flat, no colour difference and debris
visualization
Gloss
45-60 degrees
Glossiness meter measurement
PACKAGING QUALITY STANDARDS
Inspection items
Quality inspection standards
Inspection method
marking
Apply back marking and side labeling per customer requirements, with side labeling done manually using a red stamp. The inspector will ensure spray codes are clear and aesthetically pleasing. For special markings, ensure they meet customer specifications and remain intact and legible, with side codes neat and clear.
visualization
protective film
Qualified slabs shall be covered with a layer of special, the thickness of 8C PE film, dark-coloured slabs need to use low viscosity, and to ensure that the film viscosity is uniform.
visualization
Paper packaging
Ensure secure and gap-free fastening of slabs with wooden and steel nails during loading, protect with a raincloth, and use clean, flat transport vehicles to prevent damage from impact, temperature, and moisture, maintaining packaging integrity.
visualization
Glue accessories
Pack and store slabs according to customer requirements, ensuring they are placed in a designated flat area and wrapped with film to prevent damage and contamination.
check
首页
产品中心